Cone Crusher Maintenance
Cone Crusher Description:
Cone crusher through the use of the intergranular laminated design principles of the special crushing cavity and contrast to match the speed to replace the traditional single particle crushing principle, to achieve selective crushing of materials, a significant proportion of product fines and cube content to a great extent to reduce flakiness materials. Its unique lubrication system design, greatly improving the service life of equipment. High-performance non-contact labyrinth seals, no wear and improve the reliability of blocking dust, virtually eliminating the original spring cone crusher oil mixed with water and other common failure to improve life. I produced a series of highly efficient Hydraulic Cone Crusher production capacity, the best products of stone shape, and easy automatic control, with the greatest reliability and flexibility, and real users to create more value.

cone crusher maintenance
Notice of Cone Crusher:
1, the right choice for the broken material crushing chamber;
2, the ratio of feed particle size appropriate; feed evenly distributed in 360-degree range of the crushing chamber;
3, the automatic control device;
4, Smooth crusher nesting area;
5, The specifications of the conveyor belt with the maximum capacity of the crusher;
6, the appropriate choice of pre-screening and closed-circuit screening sieve specifications.
Cone Crusher Maintenance:
1, The material must be in the middle of the dealer, it does not allow direct material into the crushing chamber, because it will make broken machines overloading and uneven liner wear. Correct rearing conditions: the material is uniformly distributed crushing chamber. The amount of material should not be higher than the mortar.
2, Max feed size is not equal to the feed opening (85% of the maximum feed size of the discharge port), otherwise it will result in: low capacity. Some spare parts will be damaged.
3, Of the crusher is not allowed to start in case of accidental overload conditions.
4, Stop the crusher, the first stop connection. After all the material discharge to stop the crusher.
5, Locking system and hydraulic station, should be inspected regularly to avoid problems.
6, Change mortar: the adjustment ring on the U-shaped bolt. Zinc alloy fill out into space. When the installation or change of mortar, run for 6-8 hours, check retention, and re-tighten the U-bolt.
7, Changing the inner wall of the crusher: Cone crusher inner wall of the fixed cone crusher institutions through the cone end. Between them is zinc alloy. When the installation or replacement of the wall, run 6-8 hours, check the tightening conditions. If loose, tighten.
8, The gear mesh: the friction of the circular plate, change the gap between the gears. To make the correct meshing of gears, customers need a mat on the bottom cover. The thickness of the pad should be equal to the friction of the circular plate.
9, Bowl bearings and seals: When installing the bowl-shaped bearing to ensure that the seal damage wire rope. When assembled, scraping the sphere to ensure that the crushing cone, and maintain the space between the 0.35-0.5mm spherical. Fixed in the bowl of the bowl watt bearing latch support to prevent the rotations of the tiles. The bowl-shaped bearing support and the framework is fixed lock. If the space between the support and framework to be addressed immediately.
10, Cylinder and framework is the third transients General Assembly. In order to avoid the rotating liner, the upper part of the liner is full of zinc alloy. When replacing the new gasket, make sure that it is based on actual size, because after a long period of operation and assembly, some changes may occur crusher. If space is too large, the liner will be broken.
11, The cone liner: cone cover and eccentric shaft screw each other. In some of the zinc alloy to fill the stops rotating cover. The space is full of zinc alloy. The cover may change its shape due to the heat of zinc alloy, so check a newly built D1, D2 and B size. If it is incorrect, correct it. When the spare parts, to ensure that it is suitable for the actual size of the diameter of the eccentric shell.
12, The reasons of the shake of cone crusher's upper are: the upper vibration crusher feed uneven or excessive feeding. There are many small lump materials, raw materials or high humidity. The discharge opening is too small.
In addition, the rotating parts in the crusher protective cover, which should be prepared by the customer.